the budgeted cost of planned value plan work PV (WS) = 325
+25; 0.875+25; 1.077-50; 0.875+50; 1.07722.
After the project is completed the cumulative PI will behave relatively stable.
5% to 10% 15% to 2% 25% to 35% 50% to 75% 23